Practical Application of Reactivation Strategy as a Production Optimization in DAL-031 Shut-in Well of DAL Structure
Most of the shut-in wells in the DAL structure have a high water cut value. Strategy for reactivation of shut-in wells in the DAL structure begins with the screening of wells and layers with well parameters such as high water cut (WC) more than 90%, comparison of recovery factor from cumulative production with in-place wells radius and calculation of recovery factor based on special core analysis (SCAL) data, production forecast, and economic analysis. Based on the screening results, the DAL-031 well was selected as a candidate for the reactivation well, which was closed on January 21, 2016 due to high water cut. The strategy for reactivation of the DAL-031 well by perforating at interval 1884-1887 m and obtained oil gain of 47.04 bopd with correlation well analysis and forecast with exponential decline type for 8 years. Economic analysis was carried out by analyzed economic indicators 315.42 MUSD of net present value (NPV), 77% of internal rate of return (IRR), and 11 months and 28 days of pay out time (POT). Based on the technically and economic analysis, it was concluded that reactivation strategy of DAL-031 shut-in well is feasible to be applied.